Leave a Message
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Open lawns and mature trees at Marymoor Park in Redmond, a setting for winter walks.

What Marymoor Park Is Like Between Now and March

November 26, 2026

At Marymoor this month, maintenance crews are blowing the fallen leaves into rings around the base of each tree instead of hauling them away. The detail comes from the October meeting notes of Friends of Marymoor Park, the volunteer coalition of the park's user groups. The same notes say the seasonal workers have gone home, leaving a maintenance staff of about a dozen people. After a youth women's competition on the turf fields in November, the event calendar is quiet until March 2027.

So King County's largest park has its fewest crowds right now. The same notes show that the park after March depends partly on decisions being worked out this winter. If you're walking off Thanksgiving dinner this weekend or taking visiting family somewhere flat and open, this is the park as it stands before those decisions.

Arriving by train, and the lights that are coming

Marymoor no longer needs a car. On May 5, 2025, King County Parks opened the Marymoor Station Trail, which runs straight from Sound Transit's Marymoor Village Station to the north end of the park. On the same day it opened the Bear Creek Trail Bridge, which links the East Lake Sammamish Trail to the Redmond Central Connector. Executive Shannon Braddock said in King County's announcement that the trails let people reach the park's fields, movies and concerts "without the hassle of traffic or the cost of parking."

The station trail is about to change. According to the October Friends of Marymoor notes, lights will go in along the trail from the light rail station into the park, and a new water line will follow roughly the same path. The rain garden planned nearby is on hold until that delayed trail work is finished.

From the park, the paved network goes in every direction. The Sammamish River Trail is paved for all 10.1 miles from Bothell to Marymoor, where the Marymoor Connector links it to the East Lake Sammamish Trail. The Redmond Central Connector now runs its full 3.9 miles after the City of Redmond finished the last 1.6 miles. It follows the Sammamish Valley through downtown and crosses the river on the old railroad trestle. A Washington Trails Association trip report from May 2026 describes the Connector as wide and paved, with the light rail construction finished and access to the East Lake Sammamish Trail at Marymoor Village Station. Between the train and the paved trails, a wet day at Marymoor doesn't have to start or end in a parking lot. Our August post on Redmond's two downtowns covers what that end of the loop looks like.

If you plan to go south toward Issaquah, King County has closed a 600-foot section of the East Lake Sammamish Trail between Louis Thompson Road NE and NE Inglewood Hill Road in Sammamish. The closure started June 1, 2026, is planned to last through the end of the year and has no detour. Crews are replacing culverts to open salmon habitat on George Davis Creek, and a new, wide paved section will follow and complete the trail.

The dog area after three work parties

The off-leash area is the busiest part of Marymoor that doesn't depend on the event calendar. King County describes it as 40 acres where dogs fetch balls in the Sammamish Slough. Serve Our Dog Areas, the volunteer group that looks after it, lists fields, woods, bridges, more than six miles of looping trails and five access points along the Sammamish River on the area's west edge.

The trails have new surface going into the wet months. Friends of Marymoor's August notes record hog fuel deliveries over two weeks, and the October notes say three Serve Our Dog Areas work parties spread "a lot" of it on the trails.

The river has changed too. In August, salmon booms went into the river. The notes say the booms limit swimming at the access points but don't eliminate it. A dog that swam freely last winter may find less open water this one.

What a dollar still buys

Parking at Marymoor is $1 per vehicle per day, and paying through ParkMobile adds a $0.25 fee, according to the county's current parking page. The rate dates to 2003. At an August 2026 meeting, park administrator Justin Camputaro opened a discussion of its future, according to the Friends of Marymoor notes. In 2005 the fee brought in about $400,000, and it brings in significantly more now. Rising labor costs mean the county will start losing money at $1 a day fairly soon, and the notes record Camputaro saying the fee will have to go up or the program will end.

The group discussed several ideas, including seasonal pricing such as $1 in winter and $2 in summer, and raising the daily rate while keeping annual passes where they are. The pay machines are getting hard to keep running, and Camputaro noted that physical machines will always be needed for visitors without credit cards or phones. The discussion ended after an hour with no decision. The county's published rate is still $1, with no 2027 change on its page. The train is the other way to skip the fee.

The ballfields with a $24.1 million proposal

The largest decision about the park is in the county budget. King County's 2026–2027 supplemental budget includes a $24.1 million line called Marymoor Park Parking and Infrastructure Improvements. It would pay for a regional sports facility, and Major League Cricket has proposed a cricket venue at the Bellevue Fields inside the park. The City of Bellevue owns those fields, and King County Parks runs them under a use agreement. The Council staff report lists the funding as $12.1 million from the Seattle Orcas, $5.5 million from the Parks Levy and $6.5 million in real estate excise tax revenue. About $5.5 million would go to roads, water mains and pipes, and $18.5 million to the cricket facility itself, including grass, lighting and dugouts.

On Nov. 16, the Budget and Fiscal Management Committee recommended a version that keeps the full $24.1 million, and the full Council scheduled its action on the budget for Nov. 24. The legislative file has the full text.

Friends of Marymoor's October notes record the group's concerns about how the proposal came forward and a plan to raise them with Council members. The same notes say cricket and a proposed tennis facility are now competing for the same space. Separately, Parks plans a netted backstop for the existing cricket field and is looking at improvements to its pitch, which the notes describe as worn.

The park is still busy this winter. Eastside Audubon is planting along its Bird Loop at the November work party. The Marymoor Community Gardens had donated 2,575 pounds of food to Hopelink by October 2026 and is adding six plots to its food bank section, for 16 in all.

Two soft-surface alternatives

On days you want soft trail instead of pavement, Redmond has two other options. At the Redmond Watershed Preserve, a WTA trip report from Oct. 30, 2026, found the trails in excellent condition, brushed back, with drainages recently cleared. Parking at the north and main south lots was free, and full restrooms are at the south lot. The report's author also saw wildlife, including Douglas squirrels and woodpeckers. The city's page lists more than seven miles of mostly soft-surface trail, plus the paved, ADA-accessible Tree Frog Loop for visitors who need firm footing.

Bridle Trails State Park, on the Kirkland side of the line, has 28 miles of maintained trail used for walking, running and riding horses. Washington State Parks lists its day use as open through the winter.

Two December dates in Redmond's parks

Saturday, Dec. 5, has events morning and evening. Northwest Trail Runs holds the Redmond Reindeer Romp at the Watershed Preserve, a 5-mile or half-marathon trail race starting at 9:30 a.m. Redmond Lights opens that evening at Downtown Park from 4 to 8 p.m., and Experience Redmond lists the season through Jan. 4, 2027.

The next morning, Dec. 6, Experience Redmond lists the first Community Nature Walk with Councilmember Sayna Parsi, starting at 9:30 a.m. from the Watershed Preserve's main entrance. The listing shows the walks recurring through the end of 2027.

Decisions about Marymoor's parking, lighting and ballfields will shape what it's like to live near the park. At The Danna Team, if you're thinking through how these changes affect a home near the park or the station, our Redmond page is a good place to start, and we're always glad to talk it through. Schedule a Private Consultation.

Follow Us On Instagram